on 2018 Mar 20 5:25 PM
We are facing a problem when production order confirmed time some of the material are not consumed . I check the BOM also it already have that material .
What can be the Problem ?
It's there any report we can get unconsumed material when production order confirmed
time ?
Request clarification before answering.
Hi.
In the material master record, the backflush indicator is set to "Always Backflush"?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 5 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.