cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

SKIP Lot transfer from ERP to EWM

hennermann
Newcomer
0 Kudos
403

Dear All,

I have setup EWM-ERP integration for the QM proceses (IOT4). In the ERP QM module inspection relevance is determined with the help of the dynamic modification rule when the inspection lot with origin 17 is created based on the GR posting in EWM. According to the settings in ERP the inspection lot is skipped. The skip information is not updated in the corresponding inspection document in EWM.

Is this generally not possible to update the inspec. doc. in EWM or am I missing some settings?

We do ot want to setup the SKIP logic in EWM but use the already existing logic in ERP QM.

BR


Frank

Accepted Solutions (0)

Answers (0)