Hi experts,
I cannot find in SAP 7.0 where in ECC I can complete the set up key and the setup group, and also set the Set up activity flag in the setup activity of the recipe. These parameters are visualized in /SAPAPO/CURTO_SIMU but they cannot be completed in APO, I couldnt find in ECC where to enter these parameters.
Please help!
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
•Flag "SetupActivity" must be set in PDS, Activities tab
•Setup matrix must be maintained for the resource (/SAPAPO/RES01)
•Resource should be set as finite scheduling Resource must to be a single/single-mixed resource. Meaning that for the capacity in the Work Center on ECC side the "Number of Individual Capacities" must NOT be bigger than 1 and that the flag "Can be used by several operations" must NOT be set.
Refer SAP KBA 2514471 - Scheduling is not considering Setup Matrix
You also need to maintain the following activities
/SAPAPO/CDPSC6 - Maintain Setup Groups
/SAPAPO/CDPSC7 - Maintain Setup Matrix
Please refer,
Determining Setup Time for Sequence-Dependent Setup Activities
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sorry but my question was: In which transaction, specificately, I have to complete these two points?:
I cannot find it in the recipe (ECC- trx: c202) and in APO (TRX: CURTO_SIMU) I cannot edit.
Thank u!
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.