on ‎2018 Nov 22 6:14 AM
Hi experts,
I cannot find in SAP 7.0 where in ECC I can complete the set up key and the setup group, and also set the Set up activity flag in the setup activity of the recipe. These parameters are visualized in /SAPAPO/CURTO_SIMU but they cannot be completed in APO, I couldnt find in ECC where to enter these parameters.
Please help!
Request clarification before answering.
Hello,
•Flag "SetupActivity" must be set in PDS, Activities tab
•Setup matrix must be maintained for the resource (/SAPAPO/RES01)
•Resource should be set as finite scheduling Resource must to be a single/single-mixed resource. Meaning that for the capacity in the Work Center on ECC side the "Number of Individual Capacities" must NOT be bigger than 1 and that the flag "Can be used by several operations" must NOT be set.
Refer SAP KBA 2514471 - Scheduling is not considering Setup Matrix
You also need to maintain the following activities
/SAPAPO/CDPSC6 - Maintain Setup Groups
/SAPAPO/CDPSC7 - Maintain Setup Matrix
Please refer,
Determining Setup Time for Sequence-Dependent Setup Activities
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Sorry but my question was: In which transaction, specificately, I have to complete these two points?:
I cannot find it in the recipe (ECC- trx: c202) and in APO (TRX: CURTO_SIMU) I cannot edit.
Thank u!
| User | Count |
|---|---|
| 16 | |
| 16 | |
| 6 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.