on 2017 Apr 25 11:46 AM
Hey Folks,
greatful for any Feedback to the following question:
- we have EWM installed as an add-on to ERP
- we pick from 'C' (consignment stock) in EWM in 2 different Scenarios
Scenario 1: Pick for normal Outbound delivery
In this case the Standard automatically creates two separate material documents. One 411 material documents seconds before it creates the 601 MD for the Outbound delivery. Question: Is there any customizing to Control this? I could also imagine to post with one MD only (so with 601 C movement).
Scenario 2: Pick components for production order
In this case the Standard creates one single material document with movement type 261 C (so directly consuming from consignment stock). Question: Is there any customizing to Control that we have also two separate material documents in this Scenario?
Thanks in advance!
Request clarification before answering.
| User | Count |
|---|---|
| 12 | |
| 7 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.