on 2018 Apr 26 3:35 PM
Hello Experts,
I am currently working on SAP Work manager 6.4 sizing and stuck on the SAPS value derived in the sizing guide. Could someone help me in decripting the formulae for below details. Attached is the table given in the Sizing guide for SAP Work manager 6.4
sync per hour: 264
New WO per hour: 5
Update WO per hour: 28
Thanks in advance !!!!
Note: Since we are expecting more users, we are working on sizing of existing SMP3.0 and SAP work manager.
Regards,
Akshay
Request clarification before answering.
Hi Akshay -
You would need to figure out how much load the new users will be adding up, and adjust accordingly. You can do this by calculating the number of work orders synced per hour, both new and updated - the higher the number of work order syncs, the higher the data volume.
SAPS (SAP Application Performance Standard) is a hardware-independent unit of measurement. For information on measuring in SAPS, refer to https://www.sap.com/about/benchmark/measuring.html
Please refer to this thread for reference as well - https://archive.sap.com/discussions/thread/1799017
Thanks,
Ray
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Adding image from sizing guide.sap-wm-sizing.jpg
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 7 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.