on 2024 Dec 12 5:44 AM
Hi once Production order is Release from SAP S/4 or R3 ERP with Release Status & Transferred to SAP DM
Is it Possilble to Make changes in SAP DM & Transfer to SAP ERP
IF Yes what is message Type & Its Prerequistes
Request clarification before answering.
Hello @JENISH,
It really depends on what changes you are talking about. Some transactional order changes in DM are synchronized back to ERP, like Order Release (RMES) status and Operation Schedule changes in REO, for example. See Production Order Integration and Scheduling Options for more details. Master data changes in DM are not transferred back to ERP, as in general ERP is the master for master data objects and DM the slave.
Br, Manoel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Which message type or API call from DM to ERP will change the batch number in the production order? or Change of Qty in Component in SAP DM the API or Message Type @ManoelCosta
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.