cancel
Showing results for 
Search instead for 
Did you mean: 

SAP COPA Planning ECC Costing Based

ganesanb
Newcomer
0 Kudos
106

Dear all,

I am planning to create COPA planning in KEPM. I want to bring the weight of a product maintained in the material master basic view into an value field. I already have a value field available for this and there is Inv_weight as characteristics as well. I have the required configuration in KE4M with mapping all SD quantity fields to COPA Value fields (qty).

But still the weight is not flowing into the value fields in manual planning. I will be creating some condition records to populate a value field based upon the weight of a product.

Please suggest solutions

Thanks

ganesan

Accepted Solutions (0)

Answers (0)