SAP APO PP/DS Subcontracting with 3rd party

ws
Participant
0 Kudos
97

Hi,

we ran subcontracting in apo pp/ds with 3rd party = a component A is delievered by vendor 1020 directly to the subcontractor SUB10. we use APO 7.4

the external procurmenent relationship is of type standard, in addition in the field ship-to-location is the subcontractor SUB10.

Question about the process:

in APO in the factory location a schedule line is created to the subcontractor SUB10 for this component.

Against this SchLneThe the subcontractor SUB10 creates a StkTrfRes to the factory!

But when I check the SchLne transferred to ECC, in MD04 I see the vendor 1020.

Is this correct?

kr,

Walter