on 2020 Sep 03 8:21 PM
Hi,
we ran subcontracting in apo pp/ds with 3rd party = a component A is delievered by vendor 1020 directly to the subcontractor SUB10. we use APO 7.4
the external procurmenent relationship is of type standard, in addition in the field ship-to-location is the subcontractor SUB10.
Question about the process:
in APO in the factory location a schedule line is created to the subcontractor SUB10 for this component.
Against this SchLneThe the subcontractor SUB10 creates a StkTrfRes to the factory!
But when I check the SchLne transferred to ECC, in MD04 I see the vendor 1020.
Is this correct?
kr,
Walter