S/4 PPDS , How to set AT101-AT105 in Product master

ryoichi_niwa
Explorer
0 Likes
1,491

hi experts,

We are setting S/4 PPDS.(1909)

We looking for setting AT101-105 in Product master, but I don't find it.

Please teach me about configuration menu AT101-105 setting.

Best regards,

Accepted Solutions (1)

Accepted Solutions (1)

Sasi2005
Contributor
0 Likes

Hi ryoichi_niwa

In SAP S/4 Hana embedded PP/DS you will not be able to create these fields directly in the PP/DS side. You would need to manage it on the ECC side. Please check the OSS note

2590603- Extensibility Feature for SCM Related Fields in Product Master from 1709 release.

I hope this helps.

Regards

Sasi

ryoichi_niwa
Explorer
0 Likes

Hi Sasi

Thank you for your cooperation.

I understood that AT101-105 was gone.

I want to know how to have creating fields(on the ECC side) considered in the Scheduling Sequence on the Strategy Profile.

Background because I want to use AT101-105 with DS Heuristics.

Thanks and regards,

Ryoichi Niwa

Answers (2)

Answers (2)

Sasi2005
Contributor
0 Likes

Hi ,

If your issue is solved could you please close this thread.

Regards

Sasi

Sasi2005
Contributor
0 Likes

Hi ryoichi_niwa,

The above suggested note already explains it. You need to add the field either in the MARA table or MARC depending on if its product specific or location product specific. Once done it will be available on the product master. Post that you would need to amend the structure /SAPAPO/CDPS_FSEL_MATERIAL . This shall enable you to get the relevant field in scheduling sequence. You can use it for running the relevant sequence heuristic.

I hope this helps.

Regards

Sasi

ryoichi_niwa
Explorer
0 Likes

Hi Sisi,

Thank you for your advise.

I try Note 2590603 and amending the structure /SAPAPO/CDPS_FSEL_MATERIAL.

Thanks and regards,

Ryoichi Niwa