on 2025 May 17 1:58 AM
Request clarification before answering.
To solve this question, the following solutions may work
1. Extend Material to Plant IAI1
Transaction: MM01 (Create Material) or MM02 (Change Material)
Enter the material number, industry sector, and material type
Select the required views (Basic Data, MRP, Sales, etc.)
Enter plant IAI1 and other relevant organizational levels
Maintain all mandatory fields and save
2. Check Existing Material Data
Transaction: MM03 (Display Material)
Verify if the material is extended to plant IAI1
If not, use MM01 to extend it.
Thanks.