We would like to make our Quality system code in sync with Production system code, as we have many open Transports in Q system which is no longer needed and to be moved to production.

At the same time we don't want to loose the data( customizing , Master and Transactional ) in the Q system which is already there., Idaelly Q system should be replica of P system, But our Q system capacity ( GB ) is not same as that of P system, So it can not hold entire data of P system,

I have seen couple of copy profiles through threads, But still in confusion how to proceed