cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Reference Measuring Point and Reference Functional Location Guidance

0 Kudos
158

My understanding is that SAP will allow for the assignment of Reference Measuring Point to a Reference Functional Location. Whenever a new functional location is created and references the Reference Functional Location (RFL) with the Reference Measuring Points (RMP), the new functional location will adopt all the measuring points from the RMP.

With that said, what happens to existing functional locations if the RMP are updated on the RFL? Will the existing functional locations adopt the changes of the RFL or do only new RFL adopt the changes from the RMP?

Accepted Solutions (0)

Answers (0)