on 2023 Feb 09 6:02 AM
Hi, I am new to EWM and DAS(Dock Appointment Scheduling).
I am looking forward to use the yard mangement in EWM and DAS.
but, I have two questions during test the DAS. Please refer to belows.
Q1) If i use DAS ( mode is the EWM integration ), i cannot use the "/SCWM/YMOVE - create the yard movement" ?
e.i) move to door from checkpoint.
Q2) in EWM module,, What is the dock ? - Door is same as dock ? or Loading point is same as dock ?
i cannot fine dock configuration... only find door in EWM and loading point in DAS..
Please help me..
Best regards,
Zeko
Request clarification before answering.
Hi Zeko,
I have found the following pages. In which system should be a step executed? That depends on where is the Loading Appointment originated:
Indeed there is no object named as "dock" in EWM, we have doors.
Please check the collection of How-to guides, it has 5 documents regarding DAS and some of them even contains test cases.
Best regards,
Eszter
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 7 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.