on 2023 May 25 9:09 PM
Dear all,
For one of the project in SAP S/4HANA On-premise, we need to put away the stock in the warehouse before UD. So the requirement is:
1. We perform goods receipt (with inbound delivery). Stock appears in GR-AREA bin. The inspection type is configured, and the inspection lot is created.
2. We need to put away the stock (already with type Q) from GR-AREA to the final bin.
3. As per the current setup, the system forces the stock to go from GR-AREA to Y820 (quality area) and then finally perform putaway when UD is made.
The requirement is to avoid Q-zone. Stock should be with stock type 'unrestricted' only when UD is released. but it should be able to be posted to final bin anyways.
The client need an automatic process without user interference.
Best regards.
Luiz Huelsmann
Request clarification before answering.
Hi Luiz, I read about this functionality in ewm standard...was released to embedded 2021, take a look...https://blogs.sap.com/2021/11/29/highlights-for-manufacturing-in-sap-s-4hana - 2021-part-1-quality-management/
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
4 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.