on 2023 Mar 14 10:49 AM
Request clarification before answering.
Hi,
To release an inspection lot and make a usage decision (UD) for a material in SAP, you must first create a quality plan (QP01) for that material. This plan specifies the inspection procedures and acceptance criteria for the material. Once the plan is created, you can assign it to the inspection lot to release the lot for inspection. After the inspection is completed, you can make a UD based on the results of the inspection. The UD determines whether the material can be used or must be rejected.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Gabriele,
Would you be able to login in english, & send the picture again? With a picture of the detailed information (button "Inform. dett.")
There's probably an inconsistent status in your inspection lot with a usage decision, but without details, I can't guide you towards any solution I'm afraid.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 12 | |
| 11 | |
| 8 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.