on ‎2021 Apr 28 4:19 PM
Hello,
As I use APO today, Heuristics calculate the production needs and place production order at the Finish Good level with an MOQ. I would like to gather the production of Finish Goods using the same recipees (defined in BOM) with a MOQ on the recipee level.
Is there a specific way to parameter BOM / Finish Goods or heuristics to do so and avoid the Finish Good productions using the same recipee to be spread all over the planning?
Hope it is clear enough
Thank you in advance for your help