PPDS optmizer by week

carlos_perez8
Participant
0 Likes
157

Hi all

Is there any option to run optmizer shceduling by week, and only if there is no capacity, to schedule the order in the previous week considering orders in previous week?

With storage costs it not sequencing within every week as much as possible. And with no storage cost is moving orders to previous weeks to achive better sequencing.

Accepted Solutions (0)

Answers (0)