on ‎2020 Jul 15 10:06 AM
Hi all
When using heuristic SAP_PP_007 with reorder point and maximum stock level, the system creates proposals for the current date, and not if the proyected stock falls below reorder point in the future.
We want to produce to max stock every time proyected stock is below reorder point or safety stock.
What should be the heuristic?
Request clarification before answering.
Hello,
The reorder point is not a demand, it is just a trigger level and the replenishment quantity is based upon your lot-size strategies such as "replenishment to max. stock level"
In Reorder point planning SAP_PP_007 heuristic creates procurement proposals if the available stock falls below the reorder point. The reorder point should cover the expected average material requirements during the replenishment lead time.
You can use the safety stock with heuristic SAP_PP_018 Creation of safety stock in LC and SAP_PP_002 (Planning of Standard Lots).
Heuristics for Production Planning
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
If safety stock method is visible for a product and the safety stock requirement in product view then it will be considered in PP/DS planning. In that case you can use the product heuristic directly.
For more details refer Safety Stock in PP/DS section from SAP note
2496856 - Restrictions and Implementation Recommendations for Production Planning and Detailed Scheduling for SAP S/4HANA
Best Regards,
R.Brahmankar
| User | Count |
|---|---|
| 12 | |
| 8 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.