Hello Team,
I have a Scenario where Posting change request to move Products from SLOC A to SLOC B is raised in S4 via MIGO . Using this Posting change document number need to perform the process using RF . Is there a Logical transaction available in RF as i don't see any menu available in standard
Process Steps:
1. Perform MIGO with Mvt Type 311 with material , Product, Plant , source Sloc, Dest. Sloc
2. Delivery Document created in S4 .
3. Same document replicated to ewm as Posting change document.
Now using RF i want to perform the process of Creation of warehouse Task and confirmation with reference to this posting change Document .Is this possible in standard RF or do we need custom RF transaction to be created.
Thanks
Arjun
Request clarification before answering.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.