2019 Dec 06 6:22 PM - edited 2024 Feb 04 6:51 AM
Hi,
we created a planning area with 3 versions (baseline, upside, downside) and decided to have version-specific master data types in upside and downside versions.
After copying the planning area (Create New with Dependencies) we realized that the versions with version-specific master data types were NOT copied. It seems that this behavior is related to the version-specific master data, because for other planning areas (without version-specific master data) all versions have been copied.
We tried to add the missing versions to the new planning area manually, but this wasn't possible as well. The system rejects saving the new version (message: "The selected version-key figure assignment already exists.").
Any suggestions?
Thanks, Marco
Request clarification before answering.
Hi,
To solve it you need to select additional Version and confirm. Then you can remove latest change and at the same time you should be able to change problematic version to Baseline Key Figure.
BR,
Damian Biskup
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.