Hi All,

Planned order availability dates are misaligned between APO/ECC for material. APO consider Saturday and sunday.

I checked Location calendar as well as resource calendar. its 5 days week in APO.

Please guide where system consider 7 days for calculating avlb date.

Accepted Solutions (1)

Accepted Solutions (1)

yasmin_alayyan
Product and Topic Expert
Product and Topic Expert

Hi Suren Bhelkar,

Please check which days are maintained in those transactions:

1) In Factory Calendar assigned to the resource.

2) In Capacity Profile button, on /SAPAPO/RES01

3) In /SAPAPO/REST02

4) In /SAPAPO/CDPS_REPT, on Resource utilization

Best Regards.

Answers (7)

Answers (7)

tiago_furlanetto
Product and Topic Expert
Product and Topic Expert

Hi Suren,

Assuming you use goods receipt processing time:

In APO, a Goods Receipt activity is added to the Planned Order during creation, with the GR duration maintained in the Product Master

  • This GR activity is scheduled in APO in the Inbound Handling Resource assigned for the Location
  • On ECC, the GR processing time is taken into account using the Factory Calendar of the Plant

* If the Resource capacity in APO is not the same was the working dates of the Plant Calendar in ECC, the difference in dates is expected. You need to make sure capacity in APO Resource and ECC Plant calendar match.

* If Goods Receipt Processing Time at Material Master and Product Master was changed after the Planned Order was created, the difference in dates is expected as well, because the GR activity in APO will still have the old GR duration - to fix it, you must reexplode the PlOrd

* If GR maintained in the Material Master on ECC is different from the value maintained in the Product Master on APO, again the date difference is expected - to fix it, you need to make sure the same value is maintained in both environments and reexplode the order in APO

Regards,
Tiago

Former Member

No handling resource .

.Res02 - showing correct -off days sat and Sunday.

As per my testing, system does not consider location as well as resource calendar It is considering calendar from somewhere else.

Please let me know other setting where system consider the calendar or days while calculating planned order start date and end date

former_member197994
Active Contributor

Hi Suren,

A handling resource should be 7X24 available. Is there GR processing activity in the order?

Best regards,

Tiemin

Former Member

In resource capacity, sat sunday is off.

former_member296874
Participant

Hi Suren,

Please check if the resource capacity is maintained for sat/sun also?

Regards

Abhinay Kumar

former_member296874
Participant

Hi Suren,

Please check if the resource capacity is maintained for sat/sun also?

Regards

Abhinay Kumar

Former Member
0 Kudos

Thanks wang and Tiago.Yes.... In handling resource having 7 days calendar in location master . Issue resolved