on ‎2020 Nov 13 3:19 PM
Hi, we are working with EWM 9.5 and we are facing the following issue. We have a scenario where a partial HU picking is made in a high rack bin. The entire HU is move to a picking point. The first WO has two WT, one to move from the high rack to the picking point (Status " ") and the second one to move from the picking point to a packing area (Status "B"). After confirm the first WT with /SCWM/MON, the second WT is activated. If we confirm the first WT with /SCWM/RFUI the second WT is not activated. Any ideas?
Thanks,
Request clarification before answering.
Hi Daniil,
It is a typo. It should be "HU" instead of "RF". So I corrected my entry as "As you know HU is mandatory in LOSC unless it is ID point or Pick Point."
Hi Fernando,
Maybe you can check whether role of your storage type "PPCK" is B-Pick Point and in your storage type "RKAL" it is marked as "Pick Point Active" in Stock Removal Control part
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Fernando,
As you know HU is mandatory in LOSC unless it is ID point or Pick Point.
So, can you please make sure the Pick Point checkbox is checked for your intermediate storage type in LOSC config.
Tufan Mengus
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 15 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.