Hello Team,
I hope you are well.
I would like to understand how SAP Hana could handle the situation below :
In our current ERP System (which is not SAP), we have created 2 SKUs to handle those cases:
- SKU 1 : Aspirin [Supplier A]
- SKU 2 : Aspirin [Supplier B]
With this method we are sure that Aspirin [Supplier B] won't be sold to customer 2.
Nevertheless this creates some issues to run MRP properly at the plant of Customer 1.
Indeed, each SKU is treated separately.
In a simplified example, we have the situation below :

=> Customer 1 can accept both SKU but MRP will perform the calculations for each SKU instead of aggregating the data (Stock & Demand) of both. Therefore irrelevant suggestion will be given by MRP. Eg : Aspirin [Supplier A], there no stock and a demand, therefore MRP will suggest Purchase Requisition whereas it is not needed as we have enough stock of Aspirin [Supplier B].
How do you get MRP running properly in this situation ?
Also, is it possible to maintain a link between those 2 SKUs in the Master Data ? If yes, how ? In our Current ERP, we can link SKUs under the same Master SKU.
Thank you very much for your feedback,
Request clarification before answering.
If you use the material listing & material determination functionality you could solve the above issue.
Material listing is a functionality where in you are listing all the allowed materials for a particular customer.
Material determination is an option from which you can swap the materials if stock of one of the material is not existing.
Regards,
Radheshyam P.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.