cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Pharma -Different SKUs for same commercial product - MRP

0 Likes
1,770

Hello Team,

I hope you are well.

I would like to understand how SAP Hana could handle the situation below :

  • Product SKU : Aspirin 3mg
  • The product can be produced using raw material from Supplier A or B
  • The goods can be sold to :
  • Customer 1 who will accept Aspirin produced with Raw Material from Supplier A or B.
  • Customer 2 who will accept Aspirin produced with Raw Material from Supplier A only. In the future, this customer may accept the Raw material from Supplier B.

In our current ERP System (which is not SAP), we have created 2 SKUs to handle those cases:

- SKU 1 : Aspirin [Supplier A]

- SKU 2 : Aspirin [Supplier B]

With this method we are sure that Aspirin [Supplier B] won't be sold to customer 2.

Nevertheless this creates some issues to run MRP properly at the plant of Customer 1.

Indeed, each SKU is treated separately.

In a simplified example, we have the situation below :

=> Customer 1 can accept both SKU but MRP will perform the calculations for each SKU instead of aggregating the data (Stock & Demand) of both. Therefore irrelevant suggestion will be given by MRP. Eg : Aspirin [Supplier A], there no stock and a demand, therefore MRP will suggest Purchase Requisition whereas it is not needed as we have enough stock of Aspirin [Supplier B].

How do you get MRP running properly in this situation ?

Also, is it possible to maintain a link between those 2 SKUs in the Master Data ? If yes, how ? In our Current ERP, we can link SKUs under the same Master SKU.

Thank you very much for your feedback,

Accepted Solutions (0)

Answers (1)

Answers (1)

p391977
Contributor
0 Likes

If you use the material listing & material determination functionality you could solve the above issue.

Material listing is a functionality where in you are listing all the allowed materials for a particular customer.

Material determination is an option from which you can swap the materials if stock of one of the material is not existing.

Regards,

Radheshyam P.