on 2023 Nov 09 2:26 PM
Hi Experts,
For putaway process, full pallet is proposed with separate storage type A and partial pallet is proposed with different storage type B. But in partial pallet storage type B, the existing Destination HU in the WT must be proposed with the HU of the partial pallet already present. not sure how to achieve this.
For Eg.
1 pal = 48 EA Goes to ST A with HU 100000001 (Source HU & Destination HU is same)
24 EA goes to ST B with HU 100000002 (Source HU & Destination HU is same & proposed correctly)
24 EA goes to ST B with HU 100000003 (But Source HU & Destination HU must not be the same. The destination HU Should be proposed as 100000002 since there is space for another 24 to fill the pallet.)
how to achieve this case where the destination HU must be proposed to the existing 1 already there in the Bin.
Request clarification before answering.
Sorry can't remember there is way to do so. You may check to use BAdI to achieve this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
5 | |
4 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.