Operation schedule in SAP PP/DS

0 Kudos
196

We have a case when the order has 2 or more operations (for example, 0010, 0020, 0030). In the ppds planning board (transaction /n/sapapo/cdps0), when we move the operation 20 to the future, the operation 30 also move to the future automatically because this operation has to be after the operation 20; but the operation 0010 still in their original place. Is there any automatic way (configuration, heuristics, etc) that allow the operation 0010 move close to the operation 20 when we move this last operation?