on 2023 Sep 14 2:08 PM
Hello Experts,
Is it possible to use up the entire stock of SFG (SG130 in below case) instead of building the stock on the same and build the FG (FG129 in below case) by forward consuming the demand and doing pre-build if required for FG but use up all stock of SFG using Finite heuristics engine of Order Based Planning.
I have tried using below options but no use:
1. Use Max Stock Key figure ( I believe this is for the use cases where we want to push the stock between locations and doesn't work for the above case.)
2. Use Shelf Life on SFG (This is letting the SFG expire and generate new Planned orders in every bucket instead of pushing the same to product FG).
Thanks in advance