on 2015 Jul 25 2:03 PM
Dear All,
I am using Process Oriented Storage Control with Decon and VAS.
step1: IB01
step2: IB02
step3: VAS1
step4: VAS2
step5: VAS3
step6: IB03-----Final Put away
the following screen short also attached for your refer.......
Here my problem is:- IB01 unload task is ok
IB02 Decon is ok, after the deconsolidation system has to create VAS1 task (Decon to VAS1) but it is not happening, directly it is going to IB03 final putaway.
2nd problem
I have created packaging specifications and it is active status.
based on the the delivery, system has to create VAS order automatically, but it does not happening
when i created VAS order manually it is working properly.
PACK SPEC screen short also attached for your refer......
So, Please help me what settings has to be done for the same.
Thanks
VIJAY
Request clarification before answering.
HI Vijay,
can you let all of us know what was the real issue and what you have done to fix it?
Regards
Anoop
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vijay,
Check your VAS relevance config table where you have activated VAS relevance for your warehouse number with Document type and item type combination-you assigned a procedure. Also check at what point of time system is set up to create VAS Order (i.e. WR time or GR posting time). Same document and item types should be getting determined in your Inbound Delivery in EWM.
Then warehouse number dependent settings-what product group type you have used here, same should be assigned to your product master in /SAPAPO/MAT1
Consumption relevance indicator is required for Auxiliary materials, if there are any used in your VAS Pack Spec. Its not mandatory to have the check box checked.
Regards
Anoop Phour
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vijay
check del type in header data of del and item type in line item details in del line item.
come to vas customization
Check vas relevance and check you have maintain same document type and item type for which you are expecting vas has to create del. in standard its for different item type than del item type.
Also check in same customization same procedure used and condition type is used in packspec .
Regards
Suraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Suraj,
Could you please advise me for the POSC settings.
Confirming the IB01 - task, system is automatically created IB02 task in open condition and IB03 task in waiting.
But it should not be happen as per my settings
After deconsolidation it should go to VAS work center.
In this situation what else missing in my settings.
Thank you
VIJAY
Hi Vijay,
please recheck "vas relevance" settings and product master. if all ok, then check if you have maintained relevant ext. step in the warehouse tab in VAS packspec.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 5 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.