on ‎2022 Apr 12 1:39 PM
Hi all,
During inbound with POSC while processing with TU I am getting this error when doing unloading. Though I have maintained the hu type group in IB01 step for the warehouse.

also maintained the step in Staging area storage typeset2.jpg
Request clarification before answering.
Hello
Please follow below steps and test and let us know in case you face any issue.
1- POSC step IB01
You don't need to maintain source storage type and HU type group specific entry. If there is already such entry, you can delete those. It can be exactly like below

2- Staging area and door determination /SCWM/STADET_IN
Please create door and assign door to storage bin first before setting /SCWM/STADET_IN

3- You don't need to maintain any source storage type and bin in your IBD item WPT as staging area determination will be taken from /SCWM/STADET_IN.
Once all up- system will be ready for you to unload TU.

Regards- ASLAM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please remove the source storage type 9030 in IB01 step and try .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I guess it is checked with empty storage type, or with storage type 0001 and empty HU group.
Maybe you do not have GR bin in your delivery or something like this?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 9 | |
| 8 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.