on ‎2020 Aug 09 8:47 AM
Experts,
For the subjected error I have checked 2-3 threads but couldn't find the root cause of my issue.
I have packed 2 materials in packaging material (HU) and performed IBD. In /SCWM/PRDI I can see my HU with 2 materials and I am able to perform the Warehouse task. When I try to create, I get the above error.
But when I manually give the storage type and Bin(9010, GR-ZONE) task is getting created and WO confirmation as well. The same goes for 9010 to 8010.
please advise
Request clarification before answering.
Putaway strategy for GR-ZONE 9010 and 8010 should be "4" is different from other final storage types. Final storage types normally have the strategy of 2 (Empty or existing stock) thus system can't putaway 2 materials into same storage bin.
As standard way, you should have one HU one product / batch during putaway.
Go to check EWM - Master Data - Define Storage type, find your expected storage type and check the strategy.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 12 | |
| 8 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.