Given two source locations and two destination location. The optimizer only takes freight units from one source location. Why is the optimizer not taking the freight units from the other source location during planning run??

Accepted Solutions (0)

Answers (1)

Answers (1)

GRABLERE
Product and Topic Expert
Product and Topic Expert
0 Likes

Hi Jones,

as there is not to much background information in your very broad question, here some hints that should help you figure out the problem. There are mainly 2 options why it is not creating a multi pick. Either it is not possible to do it without violating constrains(here can be a lot of reasons like capacity, time, planning constrains) or your planning cost is set-up in way that 2 trucks are cheaper then consolidation. In general you have the optimizer explanation tool to analyse what is causing the issue. Please find below a nice guide on how to use the optimizer explanation tool:

https://blogs.sap.com/2013/03/18/monday-knowledge-snippet-mks-31-optimizer-explanation-tool/

Regards,