cancel
Showing results for 
Search instead for 
Did you mean: 

Multi-level view of material availability in SAP PP/DS

0 Kudos
326

Hi gurus, I've been told that in SAP PP/DS multi-level view of material availability is possible. What does this exactly mean? Does this mean that one can check the material availability of the entire BOM at once?

Accepted Solutions (0)

Answers (1)

Answers (1)

1417064
Explorer
0 Kudos

Yes, it is possible with T-Code MB52.