on 2023 Apr 14 11:29 AM
Hi gurus, I've been told that in SAP PP/DS multi-level view of material availability is possible. What does this exactly mean? Does this mean that one can check the material availability of the entire BOM at once?
Request clarification before answering.
Yes, it is possible with T-Code MB52.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
5 | |
3 | |
3 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.