How Can I setting APO \ECC for maturation time? What are the transaction, documentation?
My intention is perform the TLB only stock available and TLB consider maturation time, is possible this?
Request clarification before answering.
Hello,
In the existing SNP planning applications, shelf life data is not taken into account (except for the SNP optimizer - see Note 579556).
The shelf life and maturation time of a receipt are not inherited with planned stock transfers.
Shelf life data is not taken into account in the following modules: Demand Planning, SNP heuristic, CTM, Deployment, TLB, and ATP.
-------------------------------------------------------------------------------------------------------------------------
Maturation time - This field allows you to determine the amount of time between the production of a product and the earliest time that it can be used.
If you transfer stocks from ERP to SCM that are assigned batches with shelf life data, the shelf life data is also available in SNP. For further information about the required settings, see Note 751392.
BAdI /SAPAPO/SNP_SHLF, method IO_MATCHING This BAdI allows you to create a different logic for the assignment of requirements to stocks/receipts that is based on the shelf life data. By default, the system uses dynamic pegging.
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 5 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.