on 2023 Jun 13 4:30 AM
Hi All,
We have a business scenario where I need to move material from Storage Type 1 to Storage type 2 with intermediate storage type. Order strategy is Kanban Stock transfer to Production Supply Area with Outbound Delivery
I can achieve this with LOSC with one intermediate storage bin in the intermediate storage type. But we have multiple intermediate storage bins.
But we have scenario like this,
If the order is coming from BIN1 (Storage type 2), it should go through Storage type 1 to INT-BIN1(intermediate storage type ) with WT1 and from INT-BIN1(intermediate storage type ) to BIN1 (Storage type 2) with WT2
And if I get order from BIN2 (Storage type 2), it should go through Storage type 1 to INT-BIN2(intermediate storage type ) with WT1 and from INT-BIN2(intermediate storage type ) to BIN1 (Storage type 2) with WT2
We have same WPT, same pick up source storage type (storage type 1)
How do I determine different intermediate bins. We have different activity areas for the destination storage type (storage type 2) but activity area option does not exists in LOSC configuration
Any ideas how to achieve this through customizing to move material through multiple intermediate bins. Intermediate bin is dependent on the destination storage type.
Request clarification before answering.
you can use storage group, it is a bin attribut and avialable in LOSC customizing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.