cancel
Showing results for 
Search instead for 
Did you mean: 

LOSC with multiple interim LBs

benditow
Explorer
0 Kudos
1,337

Hi all,

I am facing issues with LOSC.

Item is requested for staging from storage type A to storage type E.

Picking is required, so EWM creates interim LB for HU from storage type A to storage type D.

The HU needs to be handed over via handover point, so another interm LB for HU is created from storage type A to storage type C.

Those LBs are created correctly.

Before the HU can reach the hand over point, it has to pass an elevator, so another interim LB for HU should be created from storage type A to storage type B.

Because I like drawing pictures, here the visualization of the as is and as should be situation:

As is:

As should be:

Somehow the system only creates a maximum of two interim LBs, so 3 LBs in total.

Can anyone explain to me why this is happening and a way on how to solve this issue?

Thanks in advance and best regards,

Benjamin

View Entire Topic
Daniil
Active Contributor

Hi Benjamin,

first task is a product task for pick-point, and losc would be

From A to E via D.

For second LB try to set

A to D via B.

You should have in this case

  • LB1 Picking Task in stauts B
  • LB3 HU Task A to D in status B
  • LB4 A to B active.

when LB4 gets confirmed system tries to activate LB3 and here you need a LOSC record B to D via C. Istead of activation you get your LB2.

This should work

BR,

Daniil

benditow
Explorer
0 Kudos

Hi Daniil,

thanks a lot! Thats my desired solution! I was focused on creating all LBs in advance rather than have a look at the actuel material flow.

So SAP Logic to prohibit the creation of a third inactive interim LB totally makes sense.