2025 Feb 16 5:53 PM - edited 2025 Feb 17 6:40 AM
Hello experts,
is it possible to handle configurable materials (KMAT) in IBP-OBP (oder-based-planning with R&S)?
Having FERT- and KMAT-products produced at the same bottle-neck-resource.
Is it possible to make a finite-planning in IBP-OBP for both products and are operations and components of the products added in the interface back from IBP-OBP to ECC within RTI? Like it's done for FERTs.
How are the operations and components of the KMATs getting identified.
- There is a production-version defined for maximum-BOM/routing.
- And there are no material-variants defined for the KMAT.
- There is not the characteristics-based-planning implemented.
If KMATs are not possible to handle with IBP-OBP - which other SAP-applications are recommended?
Thanks.
Jo
Request clarification before answering.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 5 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.