on ‎2017 Mar 20 1:24 PM
Hello team,
Please help me with the below simple scenario.
There are 3 different key figures KF(caluclated), KF1 & KF2 (stored). Both KF & KF1 are saved at base planning level, say A-B. But the KF2's base planning level is at A-B-C
Now i wrote the below caluclation
KF@AB = KF1@AB * KF2@AB
As per the above, even though KF2's base planning level is at A-B-C...I wanted the KF2's value to aggregate to A-B level and perform the simple multiplication.
- Validated the calculation. System didn't gave the error
- But i can't see any value on the excel sheets, even after performing simulations
Below are my questions.
Ques 1: Is the above calculation invalid? Whats going wrong
Ques 2: Is it a format issue, if the value is less than < 1 or in decimals, system choose not to display. The Key Figure display properties are also maintained as per standard.
Im not sure, why the calulcation is not happening
Please guide
Thanks
Venkat. K
Request clarification before answering.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 6 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.