Hello everyone,
I am facing the following strange issue. I am trying to transfer my consensus demand plan qty from IBP to S/4 as planned independent requirements via CPI. I am using the standard template data flow for it. The job finishes successfully, but in S/4 I don't have any planned independent requirements.
The issue I have is when I use tr. code /IBP/ETS_PIR_MON I have a error message that my material is does not exist in the plant. This is very strange because my material is existing in this plant and it is not marked for deletion. Some time ago I have tested with the same material and I did not have any problems.
Best regards,
Julian
Request clarification before answering.
Hello Julian .. I have faced the same issue like this. If you use (only) numeric material numbers, system will add additional prefix zero's based on 18 character or 40 characters length. This was causing conflict when receiving to S/4. Simply Its because of additional prefix zero's addition to the product id. Need to trim those additional zeros while transferring to S/4.
Please check the below note:
2977722 - IBP Add/On, Time Series Based: PRDID conversion in PIR integration.
Regards
Balamurugan nataraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
6 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.