Hi Expert,
Need your support on the issue which i am facing while transfer Production version from ECC to APO.
In my scenario, we have Object dependency maintained at Routing/ operation level for VC scenario in ECC. Before transferring the Production version, I transferred Class/Characteristic from ECC to APO and then trying to transfer Production version from ECC to APO.
While transferring i am facing below error message.
/SAPAPO/CURTO 804 : Error in dependency in PP/DS production data structure
28 015 : Missing comma 28 023 : Error in syntax check for simple condition
28 037 : Logical expression required
28 051 : Reference to characteristic required
28 063 : Reference to object ROOT, PARENT or SELF required
28 075 : Character string expected in quotation marks
28 084 : Reserved name TABLE invalid as key/variable name
28 091 : Error in standard dependency: TYPE_OF
28 151 : Table SMRI_MESSPAT_DN200 does not exist
If any one faced same issue, then please suggest how to solve this issue.
Thanks,
Shekar
Request clarification before answering.
| User | Count |
|---|---|
| 12 | |
| 8 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.