cancel
Showing results for 
Search instead for 
Did you mean: 

Intra-Plant Material Transfer

0 Kudos
193

Context: 1 Medical Center with 16 separate clinics - all in the same building.

Our Plant have 16 storage locations, all in the same building.

It's common to take materials from one clinic to another. But the materials need to be transferred in the system to the other clinic.

What movement type can I use for this purpose? Is 311 OK?

Accepted Solutions (0)

Answers (1)

Answers (1)

cmayank07
Explorer
0 Kudos

311 mvmt type