on 2012 Feb 14 2:33 PM
Hi,
I am facing the particular error in SAP TM 8.0. I have created a sales order, subsequent delivery. I created the FOR for the delivery in transportation cockpit.
After the charge calculation I am creating the Freight Settlement document using /SCMTMS/SFIR_CREATE_BATCH. I am transferring the FSD to ECC to create the Service PO and SES through batch program /SCMTMS/SFIR_TRANSFER_BATCH.
The service PO and SES gets created in the ECC system successfully.
After the SES is created in ECC, I am adding a charge to FOR document. After performing the charge calculation, I am creating FSD for the same document (FOR). The total amount in the new FSD is shown as the delta amount (amount for the new charge added). But when the FSD is passed to ECC to create Service PO and SES, the Service PO as well as SES has new added charge say ABC and BAS1, BAS2 charges in it.
The new Service PO is supposed to have only the newly added charge ABC. Is TM 8.0 configured to create Service PO always with BAS charges ?
I checked the Freight agreement and Charge calculation sheet in Configuration. But I was not able to find any specific config which determines the Charge types which needs to be picked during FSD creation.
Regards,
Joseph M
Hi Joseph
The new Service PO is supposed to have only the newly added charge ABC. Is TM 8.0 configured to create Service PO always with BAS charges ?
I checked the Freight agreement and Charge calculation sheet in Configuration. But I was not able to find any specific config which determines the Charge types which needs to be picked during FSD creation.
Yes it is the standard behavior, even though the net amount is shown as delta amount of newly added charges.
For me, i would see the option as good one, lets say carrier announced some discount of 10% at latter point, we would still need to see the actual base charge on which this new discount is calculated on, and on header level the net amount...
But never the less, you can delete the charges lines BAS1, BAS2 in your case before hitting save and transfer....in this way you will have only new charge line in FSD and also in Service PO
But if you want to make this as a routine then you need to define your own strategy
Process controller
In Customizing, you have set up the process controller to use with settlement documents. For example, if you want to use a strategy to create or preprocess FSDs differently than the standard way, you can define your own strategy using the process controller and assign it to a specific service. For more information, see Customizing for Transportation Management under Settlement Configure Process Controller for Settlement .
Regards
Vinod
Edited by: Vinod Kumar Pedapati on Feb 15, 2012 9:44 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
6 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.