In S&OP Operator for check mode -Infinite without shortage --popup with below message displayed.
1. Transportation of the product to the location doesn't fit in the planning horizon due to the transportation lead time of 1 period for the specified mode of transport.
2. Production of the product doesn't fit in the planning horizon due to the production lead time of 1 periods.