cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

IBP S&OP TS-based Supply Heuristic - Stop historic in-transit from being taken into account

willsuus
Participant
0 Kudos
509

We are starting the heuristic run in the current technical week and do NOT want the intransit from history to be taken into account. Is there a way to do this?

Accepted Solutions (1)

Accepted Solutions (1)

former_member654033
Contributor
0 Kudos

Hi Susan,

You should have Transport supply KF values in the past, which generates In transit supply if lead time is more than 1 week, so setting up Initialize_leadtime_Horizon check box in S&OP Operator will help.

Please try

Thanks

Girish

Answers (0)

Ask a Question