Hi all

How could we set-up in SAP IBP for Response, a storage resource?

Would this be considered by Constrained Forecast using Optimizer?

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member654033
Contributor
0 Likes

Hi Carlos,

IBP for response only supports Production resource.

Storage Resource is currently not supported in IBP for response

Thanks

Girish

Answers (1)

Answers (1)

Praveen_Jadhav
Participant

Hi Carlos,

Please follow the below steps:

1. Define the resource in MDT: RESOURCE.

2. Assign the Resouce with Location in LOCATIONRESOURCE MDT. Maintain the Capacity supply along with Resource Type = 1 (here Res Type 1 means Storage Resource).

3. Maintain LOCATIONPRODUCTRESOURCE MDT i.e. consumption rate needs to be maintained @ Location Product Resource.

Note: mark X in "time series indicator" if need capacity supply same for every period of the planning horizon

Regards,