on ‎2020 Feb 07 1:30 PM
Hi all
How could we set-up in SAP IBP for Response, a storage resource?
Would this be considered by Constrained Forecast using Optimizer?
Thanks
Request clarification before answering.
Hi Carlos,
IBP for response only supports Production resource.
Storage Resource is currently not supported in IBP for response
Thanks
Girish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Carlos,
Please follow the below steps:
1. Define the resource in MDT: RESOURCE.
2. Assign the Resouce with Location in LOCATIONRESOURCE MDT. Maintain the Capacity supply along with Resource Type = 1 (here Res Type 1 means Storage Resource).
3. Maintain LOCATIONPRODUCTRESOURCE MDT i.e. consumption rate needs to be maintained @ Location Product Resource.
Note: mark X in "time series indicator" if need capacity supply same for every period of the planning horizon
Regards,
Praveen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.