on 2019 Aug 26 5:42 PM
We have production versions that in ECC have minimum lot size and maximum lot size as a restriction.
IBP Supply has within the Production Source Header structure, lot sizes restrictions that are not based on lots (production events as in ECC), but are defined as a time bucket restriction. Additionaly, for each production version having a lot range in ECC, resource consumption is tight to a fixed time independent is production was at the minimum level, maximum leverl, or between them.
1. Is there a standard solution or suggestion of how to model this scenario in time-series planning?
2. Since Order based planning is based on orders, are this restrictions working as expected per production event?
Regards.
Request clarification before answering.
Hi,
I could not find the standard solution for the production version selection based on lot sizes as ECC does. Time series based planning works based on bucket consumption. I would recommend raising an incident to SAP Product Support for this requirement.
Best Regards,
Lingaiah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
3 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.