on ‎2019 Jun 12 2:41 PM
Hi
All when running Response Constrained Forecast with optimizer, when setting up minimum lot sizes, the results are not goods, and the systems does not use semifinished in stock because of minimm stock.
Does anyone use response otimizer?
Request clarification before answering.
Hi,
Optimizer does not respect the Minimum Lot Size configured.
Note:
Best Regards,
Lingaiah