on 2022 Sep 14 11:32 AM
I have in IBP the option to work with an exchange rate.
But it can be only maintained one course.
Now a customer want to plan 2 years in the future and for the first year, the customer want to use another exchange rate as in year 2
How can I managed this ?
Request clarification before answering.
Use Exchange rate as a KF in place of attribute as a KF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
okay, it is very simple.
we have a master data type called "exchange rate". A conversion rate is stored here.
Means, if someone changes from EUR to USD, IBP would use this conversion rate.
The requirement now is to use different exchange rates for different periods.
So for 2022 the exchange rate EUR - USD is 1.1318-- for 2023 the exchange rate EUR -USD is 1.21345 and for 2024 the exchange rate is 1.5678
And the system should be consider, if the planner change the currency