on 2022 Apr 18 8:29 PM
I have a situation where we are trying to use PP/DS in S/4 to schedule process orders by line. The factory has 21 lines, but we need to constrain the production plan to 15 resources at any 1 time. We have used Preactor on a past system and was able to constrain the plan to the number of lines (max lines) per shift. Can anyone provide direction to assist?
Request clarification before answering.