on 2022 Oct 10 1:09 PM
Dear Experts,
Good Day. Hope you are doing well.
We want to sync our Production server with our Quality server. Is there any way to sync both the server or copy the data from the Production server to the Quality server?
Regards,
Shreekumar
Request clarification before answering.
Hello Shreekumar,
The easiest way to sync Prod to Qas is to use Backup/Restore method called System Refresh. Below are some high level steps.
1. Perform full data backup of Prod and Qas database.
2. Perform Pre Refresh steps.
3. Restore Qas database with Prod backup.
4. Perform Post Refresh steps.
Actual plan may have some additional steps based on which database and SAP Product you are using.
Hope this has clarified your doubt. Let me know in case of any queries.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 8 | |
| 7 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.