on 2024 Jul 15 5:58 AM
A. Finished product-
- Containing 4 Raw material
- Required 7 operations to produce the FG material with 7 work centers
Maintain the master data with referring to the above points
B.With the following points run the project-(For each point create the new material and run the according)
- Due to machine breakdown there is a need to replace the machine and maintain it in sequences
- In the production of the finished product one co-product is producing
- In one product the SFG material is producing, as the clients requirement is they don’t want to do a production order for SFG material
- With a configuration of Order type ZZPP run the production order for 100EA
Note- For each of the point you will creat material, configruation or related things maintain in the same word format.
E.g Finished product-Fruit Juice
#SAPMM
- Containing 4 Raw material- D-RM01, D-RM02,D-RM03,D-RM04,
Request clarification before answering.